NewFree + more in Pro

Flight Analysis in 3D & 2D

Every thermal, glide and safety margin of a flight, linked to the 3D replay and the map.

Flight analysis report linked to the 3D replay and the 2D map

Open any flight and the analysis tells its story: where the time went, each thermal with its climb rate and core efficiency, each glide with its glide ratio, the low saves, the lowest point above the ground and the wind measured in your circles. In the 3D replay and in the 2D planner, each row takes the map to that moment, and each marker on the map opens its row.

What you get

  • Time budget: thermalling, gliding, straight lift and spirals.
  • Every thermal with climb, height gained, centering and core efficiency, left against right.
  • Every glide with distance, glide ratio and speed.
  • Safety margins: lowest point, low saves, strongest wind, lee side.
  • Wind measured from the drift of your circles.

Why it matters for you

  • Understand a flight in a minute instead of reading a barogram.
  • Compare what you did with the conditions you met.
  • The top of the analysis is free; the full analysis is in Pro.
Step-by-step tutorialImprove your flying with the pilot coach